SKU
MAS-BH-00083
MPN
S600

Description

Surefoot's largest model is designed to take higher loads and is used mainly in the commercial and renewable energy sector. The recommended maximum capacity is 300 kN. It has an average installation time of 40 minutes.

The S600 – 16 pile model can be used on its own or in combination to negate higher bending moment loads.

Bolting Pattern:
350-400 PCD x 4 x 26mm holes
432-500 PCD x 4 x 32mm holes

Required Micro Piles:
16 x 32NB (Nominal Bore) 42.4OD
Galvanised Pile Light, Medium, Heavy

Physical Specification

Dimensions
708 × 708 × 70 mm
Installation Surfaces
Ground-Mounted
Weight
40.64 kg

Subcomponents

Quantity Name Materials Material Finish
1
S600 Assembly, Fully Welded

Available Interfaces

Quantity Mounting
1
S600 Bolt Pattern

Installation Interface

Quantity Mounting Details
16
32NB / 42OD Pile
Multiple Pile Lengths Supported

Downloadable Resources

Surefoot Footings is a company based in Melbourne, Australia specialising in the manufacture of concreteless footings.

Surefoot is an “all in one system”, where the unique shape and high strength steel combines to create a very efficient pile cap. Once piles are driven and the cap secured, the opposing forces of the multi directional piles provides a solid, stable and economical footing. The system ...